Electrical work is usually permitted and inspected, so an electrician’s invoice tends to have more moving parts than a simple repair bill: different labor rates for the electrician and apprentice, materials, permit fees, and a note on when the work passed inspection.

This sample bills a 100A to 200A panel upgrade, splitting labor by role and listing the permit and inspection fee at cost, with the inspection date in the notes.

Use this templateOpens the free generator with these line items and terms. Your invoice stays in your browser.

Sample electrician invoice

A preview of the template filled in with fictional details. Every line, rate, and note is editable once you open it.

Sample — fictional data
Brightwire Electric LLC
Invoice
Invoice no.
BWE-2611-022
Date
Nov 18, 2026
Due
Nov 18, 2026
From
License #EC-13360 (example)
77 Foundry St, Raleigh, NC 27601
office@example.com
Bill to
Megan & Luis Herrera
1508 Oakwood Ave
Raleigh, NC 27610
DescriptionQtyRateAmount
200A main panel with breakers (materials)1$1,240.00$1,240.00
Labor — panel replacement, licensed electrician (hours)8$115.00$920.00
Labor — apprentice (hours)8$55.00$440.00
Grounding rods, bonding, wire and connectors1$186.50$186.50
Electrical permit and inspection fee (at cost)1$210.00$210.00
Subtotal
$2,996.50
Tax (not charged)
$0.00
Total due
$2,996.50
Terms Due on receipt
Payment Credit Card · Check · Bank Transfer

Panel upgrade from 100A to 200A completed and passed city inspection on Nov 17. Utility disconnect/reconnect coordinated with the power company. Workmanship warranted for 1 year.

What to include on an electrician invoice

  • License number — electricians are licensed in most states; showing the number on invoices and estimates is common practice and may be required where you work.
  • Labor by role — licensed electrician and apprentice hours at their own rates, so the customer sees who did what.
  • Materials — panels, breakers, devices, and wire — itemized for big-ticket items, grouped for small parts.
  • Permit and inspection — permit fees and the inspection result or date; customers and insurers often want proof the work passed.
  • Scope of work — a one-line description of what was installed or repaired and where (panel, kitchen circuit, EV charger).
  • Warranty — your workmanship guarantee and any manufacturer warranties on equipment.

Tips

  • Bill permit fees at cost on their own line. Folding them into labor makes your rate look higher than it is.
  • Put the inspection date in the notes once the job passes. It is useful to the homeowner when selling the house or dealing with insurance.
  • For EV chargers, solar, and generator work, list equipment model numbers — customers may need them for rebates or tax credits, which they should confirm themselves.
  • Whether electrical labor is subject to sales tax varies by state. Leave tax blank unless you know it applies, and check your state’s rules.

How to use this template

  1. Press use this template. The generator opens with the line items, payment terms, and notes from the sample above.
  2. Add your business details and logo, your client, and the invoice number. Edit or delete any line; totals update as you type.
  3. Export and choose Save as PDF, then email the PDF to your client. See how to send an invoice.

Nothing is uploaded: your draft is saved only in this browser. The generator works the same on a phone, tablet, or computer, with no app to install.

Other invoice templates

Frequently asked questions

How should an electrician bill for an apprentice?

Show apprentice hours as a separate line at the apprentice rate. Customers accept a crew more readily when they can see the lower rate applied to helper time.

Do I include the permit fee on the invoice?

Yes. Bill it as a pass-through line at cost (or with any handling charge you agreed). It shows the customer the work was permitted.

Should I charge a minimum for small electrical jobs?

Many electricians charge a minimum (for example one hour) or a trip charge for small jobs. State it when you book and show it as a line item.