Construction invoices carry more lines than most, and clients read them closely. Separating labor from materials, equipment, and pass-through costs such as permits shows exactly where the money went and makes approvals faster.

This sample is a progress invoice — payment 2 of 3 on a framing job — with a purchase order number, because general contractors and property managers often reject invoices that do not reference one.

Use this templateOpens the free generator with these line items and terms. Your invoice stays in your browser.

Sample contractor invoice

A preview of the template filled in with fictional details. Every line, rate, and note is editable once you open it.

Sample — fictional data
Keystone Framing LLC
Invoice
Invoice no.
KF-1187
Date
Nov 18, 2026
Due
Dec 18, 2026
PO no.
PO-4471
From
License #CB-55821 (example)
1450 Industrial Pkwy, Columbus, OH 43215
office@example.com
Bill to
Brightline Builders Inc.
Project: 22 Elm Ct residence
300 Main St, Dublin, OH 43017
DescriptionQtyRateAmount
Labor — framing crew (day rate)4$950.00$3,800.00
Materials — lumber and hardware package1$3,480.00$3,480.00
Equipment rental — scissor lift (per day)2$275.00$550.00
Building permit fee (at cost)1$185.00$185.00
Debris removal — 20-yard dumpster1$425.00$425.00
Subtotal
$8,440.00
Tax (not charged)
$0.00
Total due
$8,440.00
Terms Net 30
Payment Bank Transfer · Check

Progress billing: payment 2 of 3 per contract, framing complete. Materials receipts available on request. Change orders are billed separately.

What to include on a contractor invoice

  • Job site address and project name — clients with several jobs open need to know which one this is.
  • License number — many states require contractors to show a license number on contracts and bids; adding it to invoices is good practice.
  • Labor — crew, days or hours, and rate. Day rates and hourly rates both work; be consistent with the contract.
  • Materials — itemized or as a package, and whether they are billed at cost or with markup as agreed.
  • Equipment and pass-through costs — rentals, permits, and dumpster fees on separate lines.
  • Progress billing details — which draw this is, the percentage complete, and any retainage withheld under the contract.
  • PO and change orders — reference the purchase order, and bill approved change orders on their own lines.

Tips

  • Bill each draw as soon as the milestone is inspected or signed off, and attach photos or the inspection report if the client asks for them.
  • Sales tax on construction varies widely: some states tax materials only, some tax the contractor at purchase, and a few tax certain labor. The template leaves tax blank so you can enter what applies — check your state’s rules or ask your accountant.
  • Keep supplier receipts for materials billed at cost; clients and lenders often ask for them.
  • If you may need to file a mechanic’s lien, deadlines are strict and vary by state. Send invoices promptly and keep dated copies.

How to use this template

  1. Press use this template. The generator opens with the line items, payment terms, and notes from the sample above.
  2. Add your business details and logo, your client, and the invoice number. Edit or delete any line; totals update as you type.
  3. Export and choose Save as PDF, then email the PDF to your client. See how to send an invoice.

Nothing is uploaded: your draft is saved only in this browser. The generator works the same on a phone, tablet, or computer, with no app to install.

Other invoice templates

Frequently asked questions

How do I invoice for progress payments?

Issue one invoice per draw. Show the contract total, what this draw covers (a milestone or percentage complete), any retainage withheld, and the amount due now. Number each invoice in sequence so the client can track draws against the contract.

Should I itemize materials on a contractor invoice?

Itemize when the contract bills materials at cost or the client asks for detail. Otherwise a single materials package line is fine, as long as receipts are available on request.

What payment terms do contractors usually use?

Net 30 is common for work billed to general contractors and businesses; homeowners are often billed due on receipt or on completion of each stage. Use the terms in your contract.